Loading article…
Line 4 of the Hangzhou Metro (Chinese: 杭州地铁四号线; pinyin: Hángzhōu Dìtiě Sìhào Xiàn) is a rapid transit line in Hangzhou.
Description
Phase 1
Phase 1 of the line started operation since 2015. Running northeast–southwest, the line connects Hangzhou East railway station, Qianjiang New City and Binjiang District. Part of the line (Qianjiang Road to Shuicheng Bridge) runs along the north bank of Qiantang River.
Phase 2
The second phase of Line 4 is 26 km in length.[1] This extension was opened on 21 February 2022.
Opening timeline
Stations
- Legend
- Operational
- Under construction
- ^ a b Out-of-station interchange with East Railway Station (East Square)

Rolling stock
See also
References
- ^ a b "杭州地铁4号线二期又迎新进展". 2021-04-25.
- ^ "杭州市人民政府关于杭州地铁4号线二期工程、8号线一期工程、9号线一期工程车站站名的批复". 2021-03-11.
